Welcome to Manufacturing Green Industry
ISO Certified: ISO 9001-2015 & EN ISO 14001-2015 GREENCO
PRESS PARTS:
1.WASHERS: We make all kinds of washers like Star Washer, Fender washer Spring washer in sheet metals.
2.PRESS COMPONENTS: We have a total of 21 mechanical power presses from 2 tons to 75 tons. We manufacture sheet metal components from 0.5mm to 5mm on this mechanical power press.
Materials:
Alloy: CRCA/HR/GPSP
Non alloys:
SS304,Aluminium,PB,Copper,Brass,Berylium copper, PTFE, Tin
We have a total of 21 mechanical power presses from 2 tons to 75 tons. We manufacture sheet metal components from 0.5mm to 5mm on this mechanical power press.
We make the suspension assembly of the washing machine of Godrej & Boyce Mfg. company. One feature that is meant to reduce the vibrating and moving of the washer tub during the spin cycle is the suspension assembly.
To ensure proper quality, we have the best equipment in the market to aid us. From Quality Control, Quality Testing and Quality Systems, Our products go through a series of stringent quality tests before they are ready for dispatch to our customers.
To ensure proper quality ,we have the best equipment in the market to aid us.From Quality Control,Quality Testing and Quality Systems ,Our products go through a series of stringent quality tests before they are ready for dispatch to our customers.
SR.NO
1
2
3
4
5
6
7
EQUIPMENTS NAME
Dial Vernier Caliper
Dial Vernier Caliper
Micrometer
Micrometer
Dial Torque Wrench
Threading Ring Gauge
Threading Plug Gauge
RANGE
0-150mm
0-200mm
0-25mm
25-50mm
0-12Nm
M3-M10(Metric),
1/4 -20UNC,2BA-1/4BSW.
M3-M10(Metric),1/4 -20UNC,
2BA-1/4BSW.
We have our own tool room where the tools are kept for storage, prepare, repairing and machining. It consisting the big racks, shelves, cupboards and workbench to store and repair the tools. Thus it can have the facilities to design, manufacture and repair the custom requirements.
Tool room management is an area that can play a major role in downtime reduction, part quality, inventory management and overall productivity. Tool room management typically covers tool and die equipment which help us for better productivity.
The equipment directly involved in production.